Projects & Work Scopes

To date, Skyform Wind has worked on over 100 Windfarm sites, both Onshore and Offshore in the UK and Internationally.

Onshore 

  • Achany

  • Aikengall II

  • Altwallis

  • Ardoch over Enoch

  • Arecleoch Bankend Rig

  • Bhlaraidh

  • BAT

  • BAT II

  • Bhlaraig 

  • Blackhill

  • Blacklaw

  • Blantyre Muir 

  • Broadloch Rig 

  • Calder Water

  • Calliachar

  • Carcan

  • Carland Cross

  • Carno II

  • Carraig Gheal

  • Causeymire

  • Clochnahill

  • Clyde

  • Cruach Mhor

  • Crystal Rig I

  • Crystal Rig II

  • Crystal Rig III

  • Dersalloch

  • Drumderg

  • Ewe Hill I

  • Eew Hill II

  • Farr

  • Forss I

  • Forss II

Onshore 

  • Glens of Foudland

  • Gordonbush

  • Griffin

  • Hagshaw Hill

  • Harestanes

  • Hill of Towie

  • Hunterston

  • Keadby 

  • Kilgalioch 

  • Knabs Ridge

  • Lochluichart

  • Long Hill

  • Maerdy

  • Mid Hill

  • Millourhill

  • Minsca

  • Moel Maelogen 1

  • Moel Maelogen 2

  • Moel Maelogen 3

  • Mynydd Y Bewts

  • Neart Na Gaoithe

  • Pauls Hill

  • Port of Tilbury

  • Rothes I

  • Rothes II

  • Royal Tarlair

  • South Nittanshead

  • Stronlairg

  • Toddleburn

  • Torrance

  • Wetherhill

  • Whitelee

  • Wathegar 2

Offshore

  • Barrow

  • Beatrice

  • Burbo Bank

  • Dudgeon

  • Eyemouth

  • East Anglia

  • Greater Gabbard

  • Gunfleet Sands

  • Gynt Y Mor

  • Hornsea I

  • Hornsea II

  • Hywind

  • LID

  • Lincs

  • London Array

  • Lynmouth

  • Rhyl

  • West of Duddon Sands

  • Westermost Rough

International 

  • Amrumbank

  • Björkhöjden

  • Borkum Riffgrund

  • Coomacheo

  • Godewind II

  • Godewind I

  • Heron

  • Meentycat

  • Meerwind

  • Mörttjärnberget Ögonfägnaden

  • Stamåsen

  • Scily Alia Sclafani

  • Tenerife Bermejo

  • Tenerife Vera de Abote

  • Veja Mate

Siemens Gamesa Renewable Energy

Onshore & Offshore, UK Wide Statutory Inspection Framework for the Service, Maintenance and Repair of Various Windfarms, (Siemens Gamesa Renewable Energy, Scottish Power, SSE)

Skyform have an ongoing framework contract covering around 800 wind turbines on and offshore.  Stat Inspections, Service Maintainance and repair of multiple brands of Lift, Hoist, TMSE, TP's Davits, PSSR Systems

Hywind Offshore Windfarm

Skyform completed WTG Service and Inspection, Avanti Lift, Demag Hoist, TMSE Inspections – 5 5 Floating Turbines

Beatrice Offshore Windfarm

Skyform were appointed to carry out Statutory Examinations Annual Service & Maintenance of 88 7MW offshore Turbines including Avanti Service lifts DEMAG Crane, Turbine Mounted Safety Equipment, PSSR WSE and Inspections Towerhoists and HMF Cranes and Lifket Chainhoists

Neart Na Gaoithe (NNG) Pre Assembly

This project includes WTG Inspection, Goracon Lift, Demag Hoist, TMSE Inspections – 54 Turbines

Clyde Windfarm

This project includes Annual Service & Maintenance of 245 Avanti Towerhoists and HMF Cranes and Lifket Chainhoists, Adhoc Repair assistance in conjunction with Statutory Inspections.

SSE Greater Gabbard Offshore Windfarm, England

Skyform are holders of an ongoing framework for assistance with Lift repairs and resolving technical issues.

We also carried out Statutory examinations in turbine and on TP on this site from 2010 - 2015.

Hornsea 1 & Hornsea 2 Windfarms

Skyform completed the following work scope at Hornsea 1 and 2 Windfarms for SGRE and Orsted:

Hornsea 1 – SGRE – WTG Inspetion, Goracon Lift , Demag Hoist, TMSE Inspections xnr Turbines

Hornsea 1 – Orsted – TP & Deck Crane Service and Inspection, Avanti Lift, Demag Hoist, TMSE Inspections x number turbines

Hornsea 2  - WTG Inspection, Goracon  Lift, Vicinay Hoist, TMSE Inspections

Sea Angel Decommissioning

Skyform Wind were appointed by Mitsubishi Heavy Industries Europe Ltd as the Principal Contractor on the Sea Angel Decommissioning project in West Kilbride.  

The 7 Mega Watt Prototype Wind Turbine was erected in 2015 and stands at 193 meters high.  It has a rotor diameter of 167 meters – which makes it nearly as wide as it is tall!

The Sea Angel was built specifically for research and development and was one of two turbines installed at the Hunterston Onshore Test Facility.  Skyform were responsible for managing the decommissioning, dismantling and disposal of the turbine.

Skyform started the substantial decommissioning task after several months of project preparation.   

Before dismantling work could begin, Skyform removed 8000 litres of oil which was recycled by a local contractor.   The turbine was then dismantled which included degassing numerous accumulators, prior to their removal.

A significant challenge faced by Skyform has been careful planning to accommodate the vast size and scale of the turbine components – it took 3 weeks just to finish building the crane.  

The blades were removed and lowered to the ground individually using the Blade Dragon Lifting Yoke.  Each blade weighs 42 tonnes, which is more than the weight of 3 double decker buses.

Skyform Training Services

Skyform’s in house trainer has successfully delivered hundreds of lift courses in our Glasgow Head Office for delegates, often travelling internationally to receive our well established training course.

Skyform’s in-house Training Facilities

Scottish Power/ Iberdrola

East Anglia One, Lowestoft, England

Skyform were contracted to complete work on over 100 7MW Turbines.  The scope included Full Statutory Inspection, service and Maintenance of Goracon Lifts, Demag Crane, Turbine mounted safety Systems, PSSR WSE and Inspections, PPE Inspections, PAT Testing, Lifting Gear and Tackle Inspections

London Array, Ramsgate, England (London Array Ltd)

Skyform were responsible for the supply of parts and adhoc specialist services in relation to Skyman Lifts