Skyform Group are pleased to feature Skyform Wind on pages 34-39 of the HSE International Magazine http://www.joomag.com/magazine/hse-international-issue-100-issue-100/0322062001456619001 the full edition of HSE International Magazine can be found here http://www.joomag.com/en/newsstand/hse-international-issue-100/0322062001456619001
All posts by jamescsky5193uk10695
Skyform Wind continue to sponsor Polar Exploration
Skyform Wind part of the Skyform Group is delighted to continue to sponsor Phae Pritchard, Project Manager for Centrica in Grimsby, for her Polar Exploration to the “North Pole of Inaccessibility” . The photograph was taken during her conditioning training trip to Svalbard.
Statutory inspections to LINCS Windfarm
Project: Statutory inspections to LINCS Windfarm
Client: Centrica
Award Date: October 2014
Completion Date: October 2016
Skyform have been awarded the contract to carry out statutory inspections and maintenance to the wind turbine foundations at LINCS windfarm.
LINCS comprises of 75 wind Turbines.
Skyform are carrying out the inspections and maintenance of the following equipment, these inspections are carried out on a 6 monthly basis:
- Davit Cranes
- Ladders, including TP inspection
- Anchor points/ Eyebolts
- Fall Arrest Systems/ Latchways
Statutory inspections to LID Windfarm
Project: Statutory inspections to LID Windfarm
Client: Centrica
Award Date: December 2014
Completion Date: December 2016
Skyform have been awarded the contract to carry out the statutory inspections and maintenance to Linn and Inner Dowsing windfarm.
LID comprises of 54 wind Turbines.
Skyform are carrying out the inspections and maintenance of the following equipment, these inspections are carried out on a 6 monthly basis:
- Davit Cranes
- Nacelle Cranes
- Pressure Relief Valves / Accumulators
- Fall Arrest Systems/ Latchways
- Towerhoists
- Fire Extinguishers Anchor points/ Eyebolts
- First Aid equipment
- Rescue Kits
- Ladders
BaTii – 19 Onshore WTG’s Siemens / SPR
Project: BaTii – 19 Onshore WTG’s Siemens / SPR
As the industry experts, we were contacted by Siemens in Brande to undertake retrofit works to existing platforms on the x19 WTG’s at BaTii. The works included initial feasibility study followed by 3D design modelling to satisfy the client the retrofit works would not impact SWL.
The time frames for this works was very challenging however we resourced correctly and completed the works to the satisfaction of both OEM and their client with commendations given to Skyform from Siemens Project Management.